June 2018: Implementation of GWS Gaiamat at Think City’s JB office on Jalan Dhoby:

20180605_154256
Pre-Installation on 10th June 2018

 

img_20180610_114014
Indoor surface temperature before installation of green roof (39.5°C)
20180605_154013
Roof before installation
20180610_120830
Installation of L-angle edging

20180610_112737

20180610_104718
GM312 used for this site. Thickness of mat is about 35-40mm
img_20180610_125140
Additional plug plants to drape over the side. (Wedelia)
20180610_121949
Laying of mat on glass surface
20180610_124829
Skylight opening

20180610_130500

20180610_152708
Laying of irrgation driplines
img_20180610_153716
Indoor surface temperature after installation of green roof (31.7°C)

20180610_154342

20180610_153101
Green roof installation completed!
IMG_20180627_165638
Green Roof status after 2 weeks.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s