June 2018: Implementation of GWS Gaiamat at Think City’s JB office on Jalan Dhoby:
Pre-Installation on 10th June 2018
Indoor surface temperature before installation of green roof (39.5°C)Roof before installationInstallation of L-angle edging
GM312 used for this site. Thickness of mat is about 35-40mmAdditional plug plants to drape over the side. (Wedelia)Laying of mat on glass surfaceSkylight opening
Laying of irrgation driplinesIndoor surface temperature after installation of green roof (31.7°C)
Green roof installation completed!Green Roof status after 2 weeks.